Master
Plan -
On-site infrastructure improvements: •
Development of potable and non-potable water systems.
• Utilization
of two non-potable wells onsite for domestic and irrigation, and
reuse of treated effluent from wastewater.
• A private
onsite sewage treatment facility.
• Private
internal roadway system with pedestrian and bicycle pathways on
the primary roadway system.
• Pedestrian
pathways located within drainage/open space corridors for improved
circulation.
• Roundabouts
at primary road intersections.
• Scale
of roadways comply with County design standards.
• Connections
to neighboring communities – Wailea Resort and Maui Meadows.
•
Scale of private roadways consistent with rural nature of the project
and County standards for private roadways.
|